Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular by Vesgantti

Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular

$1,979.98
Skip to product information
Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular by Vesgantti

Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular

$1,979.98

Product Overview

The Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Corduroy Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Beige bridges long-lasting design and long-term durability, well-suited for dining areas. measuring 108"D x 108"W x 35.5"H, weighing 1750 Pounds, available in Corduroy - Beige. Notable features include cloud couch and couch delivers, contributing to its durable character.

Key Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 56-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and four detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 101"W x 101"D x 35.5"H and seating for 5+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 5 seater sectional couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 4 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti 101" V-Shaped Corner Couch Sectional

For shoppers comparing sofas & couches options, the Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Corduroy Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Beige provides multi-functional quality alongside cloud couch — together they support lasting comfort.

Best For

The Vesgantti 101" V-Shaped Corner Couch Sectional is best suited for: stretching out or curling up, all body types.

Quick Summary

The Vesgantti 101" V-Shaped Corner Couch Sectional is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 56 inches. Seat Height: 21 Inches. Weight Limit: 1750 Pounds. Price: $1979.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 56 inches
Seat Height 21 Inches
Weight Limit 1750 Pounds
Seating Capacity 7
Product Dimensions 108"D x 108"W x 35.5"H
Item Weight 35 Kilograms
Type Sectional
Color Corduroy - Beige

You may also like